Heating Systems
Cooling & Water
Heating Repair
Cooling & Water
Emergency & Controls
Tune-Up & Service
Indoor Air Quality
Commercial HVAC
Service Areas
Get in Touch
Resources
Commercial · Rooftop Units
Rooftop unit install, service and replacement for Las Vegas commercial properties. Carrier, Trane, Lennox, York packaged units from 3-25 tons. Semi-annual preventive service and emergency response for business-critical failures.
Why RTUs dominate
Rooftop packaged units (RTUs) combine heating, cooling, and ventilation into one self-contained cabinet installed on the roof. The design fits commercial reality: units are accessible without disturbing tenants, can be serviced during business hours, and don't take up leaseable interior floor space.
RTU size ranges from 3 tons (small retail) up to 25 tons (large box store). A 5,000 sq ft office typically runs 15-20 tons split across 3-4 rooftop units, each serving a zone. A single 25-ton unit might serve an entire warehouse.
Fuel options: gas heat + electric AC (most common), electric heat + electric AC, or hybrid (heat pump + gas backup). Rebate programs favour heat pump RTUs for cold-climate replacements — federal programs include commercial heat pumps. Related in Las Vegas: heat pump repair and AC installation.
RTU service
Coordinated with property manager. Roof access verified (ladder, hatch, boom truck). Safety fall-protection worn on all rooftop work.
Coil condition. Filter change (typically 4 filters per RTU). Belt tension. Motor bearings. Contactors. Refrigerant pressures. Gas heat exchanger inspection (fall service).
Condenser coil cleaned. Evaporator coil inspected and cleaned if needed. Drain pan cleared. Blower cleaned. Any minor repairs noted.
Service checklist filed with property manager. Any repair recommendations noted with priority. Next service date scheduled.
Rooftop access
Rooftop access varies by property. Small retail: interior roof hatch and ladder. Mid-size office: exterior ladder and safety line. Larger buildings or replacement work: boom truck for equipment delivery.
For RTU replacement we typically use a crane or boom truck to lift the old unit off the roof and set the new one on the curb. This takes 2-4 hours of crane time plus the install day itself. Coordinated with property manager to minimize tenant impact.
For semi-annual service, our techs use interior access when available. Where it isn't, we bring our own ladder. All rooftop work follows the province Ministry of Labour fall-protection requirements — fall-protection above 3m, guardrails or lifeline systems as required. Related in Las Vegas: AC installation, AC repair, and free quote.
Related services
RTU + hood + makeup air balancing.
Learn moreRTU service for tenant comfort focus.
Learn moreMulti-property RTU maintenance contracts.
Learn moreRTU failure emergency response.
Learn moreSemi-annual RTU service bundled.
Learn moreModern zone controls with RTU integration.
Learn moreRTU FAQs
Semi-annual RTU service across 5 retail properties for 3 years. Zero surprises, zero tenant complaints traced to HVAC. Consolidated invoicing makes accounting straightforward.
12-ton RTU on our office building died. Full replace including crane in 2 days start to finish. Business-hours coordination minimized interruption. Written report filed with our management company.
AC failed on a 32°C day. Emergency response had a tech on the roof in 90 minutes. Diagnosed a bad contactor, replaced from truck stock, up and running in 3 hours.
Replaced 3 gas RTUs with heat pumps. Rebate paperwork all handled by their team. Rebate reduced net cost 25% — savings on the actual invoice were meaningful.
From the blog
Ready when you are
Same-day service windows most weekdays. Written quote after the on-site assessment.
licensed and insured · Insured · Bonded · Free written estimates